InfoSewer 7.6 SP 1 Update 12 is now available for User Download – Update for 2017

Intoduction: InfoSewer is used worldwide by municipal engineers and planners to create detailed, accurate models of their sewer infrastructure systems. These models enable users to evaluate the effect of new developments, zoning changes, and other additional loads on system flows; pinpoint current and future problem areas; predict overflows and backups; and determine how to best restore needed capacity lost to infiltration and inflow with the least rehabilitation. In addition, users rely on these models to compute hydrogen sulfide generation and corrosion potential; analyze the rate of Biochemical Oxygen Demand (BOD) exertion; track sediment movement and deposition; calculate the amount of pollutant transported to the wastewater treatment plant; and assess pollutants’ impacts on receiving waters. Extensive scenario management along with domain and facility management functionality makes the program capable of analyzing existing or proposed sewage collection systems.  It has a Steady State, Design and EPS run modes and includes many of the same Arc Map tools that exist in InfoWater and InfoSWMM.

Please note that the latest releases of InfoSewer 7.6 SP 1 Update 11 products are now available on the Website for download
UPDATE InfoSewer 7.6 SP 1 Update 11 Update 1/5/2017
FULL SETUP InfoSewer 7.6 SP 1 Update 11 Setup 1/5/2017

 

System Requirements
Compatible 32-bit OS: Windows Server 2008 R2, Windows Server 2012 R2, Windows 7/8/8.1/10 pro or above
Compatible 64-bit OS: Windows Server 2008 R2, Windows Server 2012 R2, Windows 7/8/8.1/10 pro or above
Compatible ArcGIS: 10.0, 10.1, 10.2, 10.3, 10.4, and 10.5 (Check your PC ability to run ArcGIS)
Prerequisites: Microsoft Visual C++ 2008 Redistributable – x64 v9.0.30729.17/Microsoft Visual C++ 2008 Redistributable – x86 v9.0.30729.17
Hardware Requirements: CPU Speed: 2.2 GHz minimum or higher; Hyper-threading (HHT) or Multi-core recommended
Processor: Intel Pentium 4, Intel Core Duo, or Xeon Processors; SSE2 (or greater)
Memory/RAM: 2 GB or higher
Screen Resolution: 1024 x 768 recommended or higher at Normal size (96dpi)
Disk Space: 500 MB of free space to accommodate a full setup installation and additional disk space – keep as much free disk space available as possible. Its virtual memory system needs additional free disk space when working on large projects
Video/Graphics Adapter: 64 MB RAM minimum, 256 MB RAM or higher recommended. NVIDIA, ATI and INTEL chipsets supported
Networking Hardware: Simple TCP/IP, Network Card or Microsoft Loopback Adapter is required for the License Manager

 

Changes and Improvements for InfoSewer 7.6 SP 1 Update 11 (English)
Pipe Profile Input HGL red icon to switch to the current simulation Run HGL now uses the current solution for EPS, Steady State or Design based on the InfoSewer output toolbar setting.

 

InfoSewer 7.6 Update 6  is now available for User Download

Update InfoSewer Pro/Suite 7.6 Update 006 (18.52 MB), 07/23/2013
Upgrade InfoSewer Pro/Suite 7.6 Upgrade (18.93 MB), 06/28/2012

System Requirements

Compatible 32-bit OS: Windows XP Pro SP2 or above, Windows Server 2003 SP2, Windows Vista, Windows Server 2008 R2, Windows 7 Pro or above
Compatible 64-bit OS: Windows XP Pro SP2 or above, Windows Server 2003 SP2, Windows Vista, Windows Server 2008 R2, Windows 7 Pro or above
Prerequisites: Microsoft Visual C++ 2008 Redistributable – x64 v9.0.30729.17/Microsoft Visual C++ 2008 Redistributable – x86 v9.0.30729.17
Hardware Requirements: CPU Speed: 2.2 GHz minimum or higher; Hyper-threading (HHT) or Multi-core recommended
Processor: Intel Pentium 4, Intel Core Duo, or Xeon Processors; SSE2 (or greater)
Memory/RAM: 2 GB or higher
Screen Resolution: 1024 x 768 recommended or higher at Normal size (96dpi)
Disk Space: 500 MB of free space to accommodate a full setup installation and additional disk space – keep as much free disk space available as possible. Its virtual memory system needs additional free disk space when working on large projects
Video/Graphics Adapter: 64 MB RAM minimum, 256 MB RAM or higher recommended. NVIDIA, ATI and INTEL chipsets supported
Networking Hardware: Simple TCP/IP, Network Card or Microsoft Loopback Adapter is required for the License Manager

Arc GIS Compatibility

 GIS Versions: ArcGIS 9.x, 10.0, and 10.1 (Check your PC ability to run ArcGIS)

New Features

 Wet Wells Sewer engine fix to prevent negative Wet Well volumes for large pump flows. Sewer requires a combination Gravity Main, Wet Well. Pump, Chamber Node and Force Main connected upstream and downstream to a pump.
 Overflows Improvements to the way overflow is calculated from gravity mains and wet wells 1. The new FM solution can now be used for just one FM as well as multiple FM’s with upstream and downstrem connections. 2. FM solver is modified to report wet well overflow by time steps. 3. Non FM solver codes are modified to calculate the wet well overflow consistently with the gravity main overflow. 4. Gravity Main Overflow Graphs now show overflow volume per report time step.
Advanced FM Solution Two fixes and improvements to the engine of InfoSewer: 1. An error message that states that Manning”s coefficient is used instead of the HW Force Main coefficient for a FM is not repeated for all FM links, 2. The new and vastly improved FM solution for EPS simulation when accidently used for a Steady State Solution does not cause the simulation to freeze. The new FM solution is not applicable to the Steady State Solution.
Share this post!

    About Robert Dickinson

    Robert Dickinson is a Product Sector Leader with Innovyze in the USA for InfoSewer, InfoSWMM and H2OMAP SWMM. He has over 42+ years experience in modeling the key hydrologic, water quality and hydraulic processes involved in urban and surburban drainage design and analysis. He has been very lucky to work with many talented engineers and scientists in his professional life at the University of Florida, XP Software, CDMSmith, the US EPA and at Innovyze Inc which allows him to offer worldwide support, training and sales/adaptation help for the Innovyze Products InfoSWMM, InfoSewer, InfoSWMM 2D, H20Map SWMM, SWMMLive and SWMM features in ICM and ICM SE. Short Time History: Product Sector Leader with @Innovyze for InfoSWMM / InfoSewer, 46+ years w/ SWMM3/4/5 11+ Years w/ @Innovyze! 8+ years @CDMSmith 9 years w/ XPSWMM 17 years @UF Very long bio - https://www.linkedin.com/pulse/my-history-various-versions-swmm-swmm3-swmm4-swmm5-robert-dickinson?trk=prof-post
    This entry was posted in H2OMAP Sewer, InfoSewer, Updates and tagged , , . Bookmark the permalink.