InfoMaster 8.5: Rehab Actions and Costs Interface

One of the biggest upgrades to InfoMaster 8.5 is the new and improved interface for Rehab Actions, Methods, and Cost.  The new Rehab Actions and Costs window contains the same functionality as in previous InfoMaster versions, removes some of the confusion … Continue reading

Posted in InfoMaster | Tagged , , , | Comments Off on InfoMaster 8.5: Rehab Actions and Costs Interface

What’s New in InfoMaster 8.5?

 8.5 To quickly answer the question…A LOT!  We here at Innovyze consider 8.5 a major InfoMaster release and are excited to be delivering it to our clients.  InfoMaster is already revolutionizing the way asset management is done, and we think … Continue reading

Posted in InfoMaster | Tagged , , , , , , | Comments Off on What’s New in InfoMaster 8.5?

Baseline Replacement Cost

As one can imagine, it’s very difficult to forecast asset management budgets for thousands of underground pipes on a yearly basis. InfoMaster’s Baseline Replacement Cost tool simplifies this forecast to give users an easy to use tool to get an … Continue reading

Posted in InfoMaster | Tagged , , , , | Comments Off on Baseline Replacement Cost

System vs. Project Databases

Often when starting an InfoMaster project and even when opening a project you have consistently worked with, the difference between the “System” and “Project” databases can be confusing. Let’s try to shed some light on this possible confusion. When creating a new … Continue reading

Posted in InfoMaster | Tagged , , , | Comments Off on System vs. Project Databases

“Special” InfoMaster Fields

One of the best features in InfoMaster is its flexibility in terms of leveraging GIS data and the ArcGIS data structure.  95% of the time, clients can apply data fields in whatever way they specify.  However, there are some fields … Continue reading

Posted in InfoMaster | Tagged , , , , | Comments Off on “Special” InfoMaster Fields

Project Bundling – Post Rehab Plan

At the end of running a rehab flowchart, the rehab summary report is generated which shows the assigned rehab action for each pipe. However, many utilities and engineering consultants do not perform rehab actions on an individual pipe basis, but … Continue reading

Posted in InfoMaster | Tagged , , , | Comments Off on Project Bundling – Post Rehab Plan

Importing Custom Service Requests, Inspections, etc.

Many times, our clients will have custom inspection data for assets and will want to bring that information into InfoMaster.  Because InfoMaster is extremely flexible with both GIS and tabular data, there are lots of ways of doing this, but the technique … Continue reading

Posted in InfoMaster | Tagged , | Comments Off on Importing Custom Service Requests, Inspections, etc.

Exporting Map Themes from InfoMaster

One of the main benefits of InfoMaster is the ability to leverage all of the different applications already within ArcMap.  Because InfoMaster is completely built within the geodatabase structure, all InfoMaster data is also ArcGIS data.  This makes it very … Continue reading

Posted in InfoMaster | Tagged , , , | Comments Off on Exporting Map Themes from InfoMaster

CoFs & LoFs: Pie Charts and Risk Weights

Ever wonder how the LOF and COF Contribution Pie Charts  are generated in InfoMaster?  If so, read on! The percentages are calculated when InfoMaster sums the total COFs and LOFs in the risk report.

Posted in InfoMaster | Tagged , , , | Comments Off on CoFs & LoFs: Pie Charts and Risk Weights

The Relationships between Rehab Tables – Up to InfoMaster 8.1

Note: This blog applies to all versions of InfoMaster before 8.5.  In 8.5, the basic relationships still apply (Rehab Costs – > Rehab Methods, Rehab Methods -> Rehab Actions), but the interface has been completely changed.  For information on this same … Continue reading

Posted in InfoMaster | Tagged , , , , | Comments Off on The Relationships between Rehab Tables – Up to InfoMaster 8.1